
Projects
Sludge Mapping in Perth Lagoon
The survey utilized sonar and a standardized procedure to map sludge accumulation and distinguish the riverbed in Perth's lagoon.
Aeration’s influence to Sludge Blanket Thickness in Fernie, BC
Hydrasurvey quantified sludge volume and composition, revealing aeration's influence to the sludge blanket.
Sediment quantification in Stormwater Retention Ponds
Measuring and mapping sediment in stormwater ponds helps determine if and when dredging is needed, saving money on unnecessary dredging.
A sludge survey revealed that accumulation was limited to the inlet, saving the town money on dredging.
Hydrasurvey quantified sludge volume and composition, revealing aeration's influence to the sludge blanket.
Paper Mill : Cutting Costs Through Measured Sludge
The survey optimized dredging, reducing costs and enhanced infrastructure planning.
Lethbridge County Mitigates Wastewater Lagoon Risks Efficiently
The Lagoon Management Strategy enabled Lethbridge County to assess needs, prioritize projects, and optimize budgets.