Articles
How Sludge Build-up Impacts Effluent Quality: A Critical Concern for Wastewater Operators
Sludge build-up in wastewater treatment ponds can severely impact effluent quality, leading to increased pollutants, organic overloading, and operational costs. In Andrew Ambrocichuk's article, "How Sludge Build-up Impacts Effluent Quality: A Critical Concern for Wastewater Operators," he highlights the importance of proactive sludge management through regular monitoring and desludging. By addressing sludge accumulation early, operators can maintain pond capacity, ensure regulatory compliance, and reduce maintenance headaches. Learn how effective sludge management can improve both municipal and industrial wastewater treatment performance.
Winter Prep Guide: Wastewater Lagoon Maintenance Checklist
Prepare your wastewater lagoon for winter with this comprehensive Fall Maintenance Checklist. Key tasks include inspecting aeration systems, monitoring sludge levels, checking structural integrity, managing vegetation, winterizing equipment, and updating documentation. Regular maintenance ensures efficient operations and regulatory compliance through winter.
The Critical Role of Bottom Mapping in Wastewater Lagoon and Stormwater Pond Sludge Quantification
Accurate sludge quantification in wastewater lagoons and stormwater ponds is essential for efficient maintenance and regulatory compliance. At Hydrasurvey, we've discovered that relying solely on engineered drawings can lead to significant inaccuracies. After conducting over 700 pond surveys, we've found that actual liner depths often differ from as-builts, making sludge estimates unreliable without physical mapping. Our advanced bathymetric surveys provide precise bottom mapping, ensuring accurate sludge measurements. This data-driven approach saves costs by avoiding unnecessary dredging and helps maintain environmental compliance. By prioritizing physical mapping, Hydrasurvey ensures that sludge quantification studies reflect real-world conditions, leading to better decision-making and optimized operations. Trust Hydrasurvey's expertise for reliable sludge management solutions.
Measuring a Wastewater Lagoon’s Loss in Capacity from a Whaled / Blistered Liner in Alberta, Canada
Measuring a Wastewater Lagoon’s Loss in Capacity from a Bubbled Liner in Alberta, Canada. We profile sludge and sediment in all bodies of water. We have offices in Calgary, Alberta and Toronto Ontario.
Enhancing Sludge Surveys with Drone Data
In the realm of sludge surveys, drone-generated imagery emerges as a pivotal resource, displaying critical insights into diverse facets including on-site infrastructure and attributes, offshore and inshore vegetation, sludge islands, defective liners, and elevation metrics.
When Should you Complete a Sludge Survey?
There are several factors to determine how often you should conduct a sludge survey, this article describes the benefits of annual sludge surveys and the cost savings of keeping a close eye on your wastewater lagoon.
Stormwater Retention Ponds: How Sediment Surveys Inform you if it's Time to Dredge
Sediment surveys can inform you if dredging is necessary in your Stormwater Retention Ponds
How to Conduct a Basic Sludge Survey
Conducting a basic sludge survey will help you determine if you require a comprehensive sludge survey. Learn how with this article.