Articles

Courtney Felton Courtney Felton

How Sludge Surveys Reduced Dredging Costs by $98,000

Sludge surveys can revolutionize lagoon dredging projects by significantly reducing costs. A recent Hydrasurvey case study compared dredging estimates for a lagoon cell with and without sludge survey data. Without precise data, contractors priced the project with an average cost of $133,000, adding contingencies for unknowns. With detailed sludge distribution and volume information, bids dropped to an average of $34,000\u2014a 74% reduction. This $98,000 savings demonstrates how investing in sludge surveys eliminates uncertainties, optimizes project budgets, and delivers substantial financial benefits for lagoon owners.

Read More
Hydrasurvey Marketing Hydrasurvey Marketing

Winter Prep Guide: Wastewater Lagoon Maintenance Checklist

Prepare your wastewater lagoon for winter with this comprehensive Fall Maintenance Checklist. Key tasks include inspecting aeration systems, monitoring sludge levels, checking structural integrity, managing vegetation, winterizing equipment, and updating documentation. Regular maintenance ensures efficient operations and regulatory compliance through winter.

Read More
Courtney Felton Courtney Felton

When Should you Complete a Sludge Survey?

There are several factors to determine how often you should conduct a sludge survey, this article describes the benefits of annual sludge surveys and the cost savings of keeping a close eye on your wastewater lagoon.

Read More